E-pipe 100 is using an SDP (4) with an LSP that uses the path shown (PE1-PE2-PE3-PE4). Which of the following is the expected output from the OAM command?

A.

B.

C.

D.

Leave a Reply

Your email address will not be published. Required fields are marked *